HUAWEI IHB3-75SA IdeaHub B3 IdeaHub Board 3-Pro 65-inch 75-inch 86-inch Whiteboard Projector Online Meeting Conference Project Timeline
in stock
$3599.00
HUAWEI SINGAPORE OFFICIAL PARTNER
Supply and Maintenance HUAWEI SWITCH Access Control System, Video Intercom.
Sim Lim Square 02-81 10am-7pm Daily.
Whatsapp Enquiry Project +65 98534404, Technical Support +65 81120788, Site Visit Maintenance +65 81985572.
in stock
HUAWEI IHB3-75SA IdeaHub B3 IdeaHub Board 3-Pro 65-inch 75-inch 86-inch Whiteboard Projector Online Meeting Conference Project Timeline
HUAWEI IdeaHub Board 3-Pro 65-inch $3599.00 | 75-inch $3999.00 | 86-inch $4699.00
HUAWEI IdeaHub B3 65-inch $4699.00 | 75-inch $5999.00 | 86-inch $7999.00
Smart Whiteboard | Projector Replacement | Online Meeting & Conference Solution
Ideal for Office, Education & Enterprise Collaboration in Singapore
The HUAWEI IdeaHub B3 (IdeaHub Board 3-Pro / IHB3-75SA Series) is an all-in-one intelligent collaboration display designed to replace traditional projectors, whiteboards, and conferencing systems. Available in 65-inch, 75-inch, and 86-inch sizes, the IdeaHub B3 enables seamless online meetings, interactive whiteboarding, wireless projection, and real-time collaboration for modern workplaces in Singapore.
Engineered for boardrooms, classrooms, and command centres, the IdeaHub B3 delivers ultra-clear visuals, smooth touch interaction, and enterprise-grade reliability.
Key Features of HUAWEI IdeaHub B3 / Board 3-Pro
1. Ultra-Clear 4K Display (65” / 75” / 86”)
The IdeaHub B3 features a high-brightness 4K UHD panel, providing sharp images and vivid colours even in well-lit rooms. It is ideal for presentations, design reviews, project timelines, and data analysis.
2. Interactive Smart Whiteboard
Transform meetings into productive collaboration sessions with:
- Multi-touch writing and annotation
- Smooth handwriting recognition
- Multiple pen colours and tools
- Instant saving and sharing of meeting notes
Perfect for brainstorming, training, and planning sessions.
3. All-in-One Projector Replacement
The IdeaHub B3 eliminates the need for:
- Traditional projectors
- External whiteboards
- Separate audio systems
It reduces maintenance costs and simplifies meeting room setups.
4. Online Meeting & Video Conferencing Ready
Designed for hybrid work environments, the IdeaHub B3 supports:
- Online meetings and video conferences
- Screen sharing with remote participants
- Clear audio and visual communication
- Seamless integration with popular conferencing platforms
5. Wireless Projection & Screen Sharing
Participants can share content wirelessly from laptops, tablets, or smartphones, improving meeting efficiency and reducing cable clutter.
6. Project Timeline & Collaboration Tools
Easily display and manage:
- Project timelines
- Workflow charts
- Engineering drawings
- Educational content
- Management dashboards
This makes the IdeaHub B3 suitable for project management, planning reviews, and executive meetings.
7. Enterprise-Grade Security & Reliability
Built with Huawei’s enterprise technology, the IdeaHub B3 offers secure system architecture suitable for corporate, education, and government environments.
Ideal Applications in Singapore
Corporate & Enterprise
- Boardrooms and meeting rooms
- Strategy and planning sessions
- Project timeline reviews
- Hybrid meetings and video conferences
Education & Training
- Classrooms and lecture halls
- Training centres
- Interactive teaching and e-learning
Government & Professional Use
- Command centres
- Briefing rooms
- Collaboration hubs
Benefits for Businesses & Institutions
- Improved meeting efficiency and collaboration
- Reduced hardware and maintenance costs
- Cleaner, cable-free meeting rooms
- Better engagement for both physical and remote participants
- Future-ready solution for hybrid work and learning
Professional Supply, Installation & Support in Singapore
CHOICECYCLE provides end-to-end support for HUAWEI IdeaHub B3 / Board 3-Pro, including:
- Solution consultation and sizing recommendation
- Professional installation and configuration
- Integration with existing AV and network systems
- Maintenance, troubleshooting, and upgrade services
Website: https://sgcctv.biz
WhatsApp: +65 98534404
Email: [email protected]
HUAWEI IHB3-75SA IdeaHub B3 IdeaHub Board 3-Pro 65-inch 75-inch 86-inch Whiteboard Projector Online Meeting Conference Project Timeline
More Options :
HUAWEI Router AP162E AX3000 Wi-Fi 6 ||
HUAWEI Router AP361 AX1800 Wi-Fi 6 ||
HUAWEI Router AP362E AX3000 Wi-Fi 6 ||
HUAWEI Router AP371 BE3600 Wi-Fi 7 dual-band 2.5GE || HUAWEI Router AP673 BE14000 Wi-Fi 7 Tri-Band 5GE ||
HUAWEI SWITCH 8-Port Gigabit S110-8P2ST || HUAWEI SWITCH 16-Port Gigabit S110-16LP2SR |
HUAWEI SWITCH 24-Port Gigabit L2 10GE S310-24PN4X || HUAWEI SWITCH 24-Port Gigabit L2 PoE S310-24P4X || HUAWEI SWITCH 24-Port Gigabit L2 S310-24ST4X ||
HUAWEI SWITCH 24-Port Gigabit L3 S530-24ST4XE ||
HUAWEI SWITCH 48-Port Gigabit L2 S220-48P4X ||
HUAWEI IHB3-75SA IdeaHub B3 IdeaHub Board 3-Pro 65-inch 75-inch 86-inch Whiteboard Projector Online Meeting Conference Project Timeline
Nunc lacus elit, faucibus ac laoreet sed, dapibus ac mi. Maecenas eu ante a elit tempus fermentum. Aliquam commodo tincidunt semper. Phasellus accumsan, justo ac mollis pharetra, ex dui pharetra nisl, a scelerisque ipsum nulla ac sem. Cras eu risus urna. Duis lorem sapien, congue eget nisl sit amet, rutrum faucibus elit.
Donec accumsan auctor iaculis. Sed suscipit arcu ligula, at egestas magna molestie a. Proin ac ex maximus, ultrices justo eget, sodales orci. Aliquam egestas libero ac turpis pharetra, in vehicula lacus scelerisque. Vestibulum ut sem laoreet, feugiat tellus at, hendrerit arcu.
Nunc lacus elit, faucibus ac laoreet sed, dapibus ac mi. Maecenas eu ante a elit tempus fermentum. Aliquam commodo tincidunt semper. Phasellus accumsan, justo ac mollis pharetra, ex dui pharetra nisl, a scelerisque ipsum nulla ac sem. Cras eu risus urna. Duis lorem sapien, congue eget nisl sit amet, rutrum faucibus elit.
Related Products
Hikvision Camera 5MP 3K DS-2CE76H0T-ITPF CCTV Camera DOME Night Vision Sim Lim Square CCTV Shop CCTV Camera Upgrade Repair
Save22.2%Save $20.00Only$70.00$90.00Original price was: $90.00.$70.00Current price is: $70.00.- Rated 5.00 out of 5
Dahua Bullet Network Camera IPC-HFW3241E-AS Security System CCTV Camera World Top Security Manufacturer 2MP H.265+ Lite AI IR Fixed Focal Outdoor Weatherproof IP67
Rated 5.00 out of 5Save15.6%Save $25.00Only$135.00$160.00Original price was: $160.00.$135.00Current price is: $135.00. HIKVISION CCTV Camera Package Plug and Play Package for 6 Full HD Camera Installation service
Save27.3%Save $232.00Only$618.00$850.00Original price was: $850.00.$618.00Current price is: $618.00.















Reviews
There are no reviews yet.